Euroteck systems recently completed its largest ever Radiation Safety system installation at Hinkley Point C Nuclear Power station. Nine very large concrete bunkers were equipped to carry out Radiography in accordance with IRR2017.
The main contractor was BYLOR with RPA services provided by L2Businessconsulting and the X-Ray systems provided by Oceaneering.
Our thanks to Mark Lyon of L2Businessconsulting for his valuable advice and support.
This project was immense from a Radiation Safety perspective as the list of materials illustrates.
99 Light boxes 72 of which were specially designed for the project
12 Radiation Detection Systems
20 Emergency pull cord systems
27 high specification door safety sensors
9 Control Panels
18 Mobile E-stops
4,200 metres of cable
The project was delivered on time and on budget.
Visit the Euroteck Systems UK Ltd website for more information on Euroteck completes its largest ever Radiation Safety Installation to IRR 2017 Regulations