Induction Bending with Post Bend Heat Treatment API 6A Annex M
Some specs will not accept a bend without post-bend heat treatment. Fair enough. Getting it done close to the bending shop saves time and transport.
Induction Pipe Bending UK Ltd works with a local, state of the art heat treatment facility calibrated to API 6A 21st Edition Annex M.
That keeps the whole route short: bend, heat treat, test in our UKAS lab, NDT, bevel and dispatch. No pipe going up and down the country between suppliers.
Ideal for wellhead, high pressure and qualified procedure work.
Visit the Induction Pipe Bending UK Ltd website for more information on Induction Bending with Post Bend Heat Treatment API 6A Annex M