Menu

Water Sample Coolers

The sample cooler should be set up as close as possible to the system take-off point at a height to facilitate convenient operation. The unit must be mounted up-right. An isolating valve capable of lasting the full system pressure should be installed straight away by the take-off point. The cooling water should be taken to a suitable drain through a tundish.

Visit the Interflex Hose and Bellows Ltd website for more information on Water Sample Coolers

ENQUIRY FORM

More Products

  • Specialist Suppliers of Stainless Steel Pump Connector Anchor with BSPT Hex Male Ends

  • Specialist Suppliers of Stainless Steel Pump Connector with Fixed Flange Ends

  • Hump Hoses

  • UK Suppliers Of Stainless Steel Vibration Eliminators